The project consisted of hillside construction which required for major engineering to facilitate the installation of underground utilities and cast-in-place retaining walls. The two story buildings consisted of masonry and stucco construction, with framed wood roof systems. The eight structures included two hydraulic elevators, extended balconies, and interior court breezeways for court yard access.

View Map of Projects