The project occupied a 26-acre site consisting of a FDA Food Grade 183,000 SF cold-storage warehouse, 30,000 SF office, 15,000 SF heavy vehicle maintenance facility and fueling island. The buildings construction consists of slab-over-rigid insulation and vapor barrier and tilt concrete panel walls with a 3” layer of ridged insulation between a 3” concrete panel and a 10” structural tilt panel. The maintenance building has seven maintenance bays, a fuel island, a high-pressure wash area, a ganty-mounted truck wash, oil lubrication systems, overhead cranes and compressed air station. The Renaissance Companies engineering and cost control efforts resulted in cost savings of over $60,000.